Sr No. Sector Summary Status Project Name Dept/ Agency Estima-ted Cost (in Cr. Rs.) Unit/ Capacity Location State Struc-ture (BOO/ BOOT etc.) Mode of Award (ICB/ Domestic Tender/ Negotiated) Date of Bid Invitation Date of Award/ Likely award Likely date of comple-tion Govt. support (Equity,Grant, etc.) Name of Private Developer Period of Cont-ract/ Concession Remarks if any. Source Updated on
1 Power Pipeline Combined Cycle Power Project Pipavav   8,000 2000 mw Pipavav Gujarat                   GIDB Mar-13
2 Power Pipeline Canal based Hydro   55     Gujarat BOT Domestic Tender NA NA NA - To be decided through bidding procedure 35   GIDB Mar-13
3 Power Pipeline ESSAR Hazira expansion project   1,500 515mw   Gujarat                   GIDB Mar-13
4 Power Pipeline Gogha Power Project Bhavnagar   1,652 375mw Bhavnagar Gujarat                   GIDB Mar-13
5 Power Pipeline GSEG Hazira Expansion   500 615mw   Gujarat BOT Cometitive NA NA NA SSNNL To be decided through bidding procedure 35   GIDB Mar-13
6 Power Pipeline Mundra Ultra Mega Power Project   6,000 1900mw Mundra Gujarat                   GIDB Mar-13
7 Power Pipeline Small Hydro Power Generation station at Damanganga (Madhuban)Dam Narmada, Water Supply, Water Resour-ces Depart-ment, GoG 15.8     Gujarat Design,Build,Finance,Operate,Maintain and Transfer Selection of a person by inviting comparative bids under Sec 10 of The Gujarat Infrastructure Development(Amendment) Act,2006 28/7/06 2007 NA - To be decided through bidding procedure 35   GIDB Mar-13
8 Power Pipeline Small Hydro Power Generation station at Karjan Dam Narmada, Water Supply, Water Resour-ces Depart-ment, GoG SSNNL 16.1     Gujarat Design,Build,Finance,Operate,Maintain and Transfer Selection of a person by inviting comparative bids under Sec 10 of The Gujarat Infrastructure Development(Amendment) Act,2006 28/7/06 2007 NA - Developer Selection Process in progress 35   GIDB Mar-13
9 Power Pipeline Small Hydro Power Generation station at Wanakbori Dam Narmada, Water Supply, Water Resour-ces Depart-ment, GoG 6.1     Gujarat Design,Build,Finance,Operate,Maintain and Transfer Selection of a person by inviting comparative bids under Sec 10 of The Gujarat Infrastructure Development(Amendment) Act,2006 28/7/06 2007   - Developer selection Process in progress 35 yrs   GIDB Mar-13
10 Power Pipeline Surat Lignite Expansion project GIPCL 1,000 250mw Surat Gujarat                   GIDB Mar-13
11 Power Pipeline Torrent Power Surat   3,500 1075mw Surat Gujarat                   GIDB Mar-13